LECOM School of Dental Medicine
Bradenton, FL
The LECOM project consists of two 225 seat lecture halls located on the second level of the LECOM School of Dental Medicine. The architect selected the PREFOAM System due to its light weight and ability to distribute the dead and live load over the full surface area of the stadium seating. The project was designed by Fawley Bryant Architects and the Construction Manager was Willis Smith Construction based in Sarasota. The project is a seismic PREFOAM System and was constructed in 2014.